First Sentence:
This section covers the installation of: 1) service piping, such as water, gas, and air; 2) plumbing fixtures and components; and 3) sanitary, weather and waste drainage systems.
Read the first page
Key Phrases - Statistically Improbable Phrases (SIPs):
(learn more)
pipe manhours, cubic yard dipper, final location site, increase manhours, hoisting into place, installation manhours, cubic yard bucket, manhour tables, respective tables, job storage, miscellaneous steel, field fabrication, duct fittings, duct accessories, erection site, composite rate, service piping, installing items, power wiring, shop fabrication, pipe bends, square pads, sheet piling, cable tray, job handling
Key Phrases - Capitalized Phrases (CAPs):
(learn more)
Mile Haul, Rigid Galvanized-Conduit, Wash Fountain, Average Weight Short Tons Manhours, Gauge Pounds Per Square Foot, Ground Type Receptacle, Pounds Manhours, Reducing Couplings, Half Couplings, Square Cover, Deep Placing, Female Stud, Flame Cutting, Group One, Group Two, Heat-Coiled Bimetal, Oiler Total Engr, Plate Thickness Inches, Rectangular Sheet Metal Steel, Screwed Fittings, Capacity Tons Power, Circular Primary Sheet Metal, Group Three, Heights To Item Description Unit, Rectangular Aluminum Sheet Metal
New!
Books on Related Topics |
Concordance
|
Text Stats
Browse Sample Pages:
Front Cover |
Table of Contents |
First Pages |
Back Cover |
Surprise Me!