First Sentence:
The following is a detailed explanation of a sample entry in the Unit Price Section.
Read the first page
Key Phrases - Statistically Improbable Phrases (SIPs):
(learn more)
pneumatic nailed, pile cluster, long wing walls, ost ata, diameter pipe size, soft old mortar, sloped backfill, added inch thick, steel service pipe, alternate pricing method, city cost indexes, direct chute, sprig planter, critical supporting data, average reinforcing, ton design load, relay rail, men itie, historical cost indexes, hydraulic backhoe, bell diameter, bare material cost, push spreader, construction cost data, eave height
Key Phrases - Capitalized Phrases (CAPs):
(learn more)
Utility Services, Building Services Piping, Reference Numbers Reference, City Cost Indexes, Reference Nos, Means Company, Concrete Forms, Rough Carpentry, Concrete Reinforcement, Means Estimating Seminars, Metal Fabrications, Temporary Facilities, Thermal Protection, Building Construction Cost Data, Cast-In-Place Concrete, Basic Materials, Division Notes, Piped Energy Distribution, Plumbing Fixtures, Site Restoration, Wiring Methods, Basic Concrete Materials, Basic Wood, Catch Basins, Electrical Power
New!
Books on Related Topics |
Concordance
|
Text Stats
Browse Sample Pages:
Front Cover |
Table of Contents |
First Pages |
Index |
Back Cover |
Surprise Me!