First Sentence:
Everyone who has ever been associated with software projects even peripherally realizes how difficult it has always been to exactly match the developed product to the users' needs and how software "bugs" seem to surface at the worst possible times.
Read the first page
Key Phrases - Statistically Improbable Phrases (SIPs):
(learn more)
software development contractor, status accounting system, software product specification, originating requirements, software test descriptions, software design document, formal qualification tests, interface design document, software development plan, interface requirements specification, personnel for adequacy, asterisked questions, software specification review, ensuring traceability, software test plan, latent requirement, formal qualification review, independent verification and validation, software contractor, computer software configuration item, software engineering capability, test readiness review, evaluation master plan, allocated baseline, physical configuration audit
Key Phrases - Capitalized Phrases (CAPs):
(learn more)
Department of Defense, Software Engineering Institute, James Martin, Manpower Estimate, Cadre Teamwork, Principal Paradigm, Evaluation Report, Requirement Criticality
New!
Books on Related Topics |
Concordance
|
Text Stats
Browse Sample Pages:
Front Cover |
Table of Contents |
First Pages |
Index |
Back Cover |
Surprise Me!