First Sentence:
The one purpose of test following design is to verify product specifications, sometimes called design verification testing (DVT).
Read the first page
Key Phrases - Statistically Improbable Phrases (SIPs):
(learn more)
controlled stress testing, analog workbench, new test process, test process step, ongoing reliability testing, early component failures, load regulation test, unit functional testing, manufacturing test process, power supply products, power supply testing, pilot production phase, full output voltage, power supply specifications, functional testers, testing power supplies, automated testers, missing cycles, loop testing, unit testers, linear power supplies, unit under test, incoming inspection, most power supplies, electronic loads
Key Phrases - Capitalized Phrases (CAPs):
(learn more)
United States, Six Sigma, Efficiency Efficiency, Parametric Plotter, American National Standards Institute, Annotated Bibliography, National Bureau of Standards, Phase Four, Phase One, Phase Three, Phase Two, Production Maturation, Watts Out, Computer Controlled Unit, Environmentally Shorts, External Clock Input, Function Input, Hold-Up Time Hold-up, International Electrotechnical Commission, Phase Five, San Jose, Scope Set, Sons Sot, Start-Up Time Start-up, Underwriters Laboratories
New!
Books on Related Topics |
Concordance
|
Text Stats
Browse Sample Pages:
Front Cover |
Table of Contents |
First Pages |
Index |
Back Cover |
Surprise Me!