Enter your mobile number or email address below and we'll send you a link to download the free Kindle App. Then you can start reading Kindle books on your smartphone, tablet, or computer - no Kindle device required.

  • Apple
  • Android
  • Windows Phone
  • Android

To get the free app, enter your email address or mobile phone number.

Project Scheduling Handbook (Civil and Environmental Engineering) Har/Dskt Edition

2 out of 5 stars 1 customer review
ISBN-13: 978-0824746216
ISBN-10: 082474621X
Why is ISBN important?
ISBN
This bar-code number lets you verify that you're getting exactly the right version or edition of a book. The 13-digit and 10-digit formats both work.
Scan an ISBN with your phone
Use the Amazon App to scan ISBNs and compare prices.
Have one to sell? Sell on Amazon
Buy used On clicking this link, a new layer will be open
$9.14 On clicking this link, a new layer will be open
Buy new On clicking this link, a new layer will be open
$159.95 On clicking this link, a new layer will be open
More Buying Choices
15 New from $13.78 18 Used from $9.12
Free Two-Day Shipping for College Students with Amazon Student Free%20Two-Day%20Shipping%20for%20College%20Students%20with%20Amazon%20Student


Save Up to 90% on Textbooks Textbooks
$159.95 FREE Shipping. Only 1 left in stock (more on the way). Ships from and sold by Amazon.com. Gift-wrap available.

Editorial Reviews

Review

This handbook is a very practical guide that addresses the day-to-day needs of professional project schedulers and managers. It is appropriate for residential, commercial, industrial, and civil construction ventures … . The most intriguing aspect of the book is the computer disk included in the back. This disk includes a … project scheduling program [which] can be adapted for nearly any size construction company and is appropriate for any size or type of construction project. … This book is recommended for academic engineering libraries that support programs in construction management. It is also recommended for special libraries connected to construction companies.
- E-Streams, Vol. 7, No. 3, March 2004

…This edition will definitely be on my shelf and if you're serious about carving out a successful career as tomorrow's American builder…grab this very special book in a hurry before they sell out.

Chad Simmons, President, Simmons Engineering Company, Silicone Valley, California, U.S.A.
NO_CONTENT_IN_FEATURE

China
Engineering & Transportation Books
Discover books for all types of engineers, auto enthusiasts, and much more. Learn more

Product Details

  • Series: Civil and Environmental Engineering (Book 15)
  • Hardcover: 400 pages
  • Publisher: CRC Press; Har/Dskt edition (September 30, 2003)
  • Language: English
  • ISBN-10: 082474621X
  • ISBN-13: 978-0824746216
  • Product Dimensions: 1 x 6 x 9 inches
  • Shipping Weight: 1.5 pounds (View shipping rates and policies)
  • Average Customer Review: 2.0 out of 5 stars  See all reviews (1 customer review)
  • Amazon Best Sellers Rank: #3,848,033 in Books (See Top 100 in Books)

More About the Author

Jonathan F. Hutchings is the author of numerous books published by McGraw-Hill Books, New York City; Marcel Dekker Publisher, New York City; Taylor & Francis Books, Boca Raton; and Hutco Publishers, Santa Cruz. He has been a tenured author at Amazon Books since 1995, with Amazon Books Best Sellers Rank: #2,893,623 and Kindle Store sales rank: #1,466,689.

His nonfiction books are in worldwide distribution and listed at Amazon Books.com, Barnes & Noble Books.com, along with his publishers' web sites. His e-book novels are in worldwide distribution at Amazon Kindle Store. He can be contacted through his current publisher at: HutcoPublishers@gmail.com

He lives on the Central Coast of California.

Customer Reviews

5 star
0%
4 star
0%
3 star
0%
2 star
100%
1 star
0%
See the customer review
Share your thoughts with other customers

Top Customer Reviews

Format: Kindle Edition
I am a professional design engineer and am always looking to self-educate by reading, especially material geared towards other members of a project team.

I have not yet reviewed the scheduling spreadsheets. It is distribued on a 3.5-inch floppy which none of my computers have. Although the book is copyrighted 2004, there are references to Windows 3.0 and Excel 97. But I would imagine for small scale construction scheduling one's attention is better directed at Microsoft Project 98 or 2000 and a third party guide which will provide you with more than probably needed on the subject of CPM. And there are more powerful, competing software products.

A recommendation to print reports on carbon or NCR paper caught my eye, confirming this book is based on pre-2004 material.

Web-based reporting, email, and PDF's are having a significant impact on schedule information collection, reporting, and filing. A chapter on this, ammendinig obviously older-but-fundamental material, is needed.

Additionally, as a design-side reviewer, the subject of submittal management (the text should reflect that, for many years now, shop drawings are only one type of submittal) should be given more attention. They should be QC'd for conformance to the contract documents and scheduled just like everything else.
Comment 1 of 1 people found this helpful. Was this review helpful to you? Yes No Sending feedback...
Thank you for your feedback.
Sorry, we failed to record your vote. Please try again
Report abuse

Set up an Amazon Giveaway

Amazon Giveaway allows you to run promotional giveaways in order to create buzz, reward your audience, and attract new followers and customers. Learn more
Project Scheduling Handbook (Civil and Environmental Engineering)
This item: Project Scheduling Handbook (Civil and Environmental Engineering)
Price: $159.95
Ships from and sold by Amazon.com
Want to discover more products? Check out this page to see more: construction excavation