First Sentence:
The following is a detailed explanation of a sample entry in the Unit Price Section.
Read the first page
Key Phrases - Statistically Improbable Phrases (SIPs):
(learn more)
long wing walls, drip lawn watering sys, pile cluster, earth fill dump, second location same kit, diameter pipe size, asphalt bedding, pneumatic nailed, run gravel borrow, dump trailers, city cost indexes, critical supporting data, exterior plyform, precast prestressed piles, sloped backfill, added inch thick, lawn watering system, soft old mortar, mastic bedding, min setup, alternate pricing method, relay rail, men itie, steel service pipe, polished bronze top
Key Phrases - Capitalized Phrases (CAPs):
(learn more)
Daily Costs, Daily Totals, Bare Incl, Truck Driver, Bare Costs Subs, Reference Nos, Exterior Plants, Means Estimating Seminars, Cement Finisher, Utility Services, Electrician Foreman, Bare Total, Building Services Piping, New York, Building Laborer, Carpenter Foreman, Pipe Freezing, Reference Numbers Reference, Steel Workers, Air Compr, Reed Construction Data, Steel Foreman, Gas Welding Machine, Laborer Foreman, Solid Brick
New!
Books on Related Topics |
Concordance
|
Text Stats
Browse Sample Pages:
Front Cover |
Table of Contents |
First Pages |
Index |
Back Cover |
Surprise Me!