|
Building Construction Cost Data 2002 (Means Building Construction Cost Data, 2002)
by Phillip R. Waier
See all pages
with references to "thin coat plaster finish".
Excerpt - on Page 278: "
... thick, on walls or ceilings, standard, no finish in(Juded 2 Carp 1,900 .008 S.F. .22 .25 .47 .63 1100 With thin coat plaster finish 875 .018 .29 .55 .84 1.17 1400 On beams, columns, or soffits, standard, no finish included 675 . ... "
|
|
Repair & Remodeling Cost Data 2005 (Means Repair and Remodeling Cost Data)
by Howard M. Chandler
See all pages
with references to "thin coat plaster finish".
Excerpt - on Page 227: "
... 008 S.F. .18 .29 .47 .68 1100 With thin coat plaster finish 875 .018 .25 .63 .88 1.32 1400 On beams, columns, or soffits, standard, no finish included 675 .024 .21 .81 ... "
|
|
See all pages
with references to "thin coat plaster finish".
Excerpt - on Page 291: "
... 78 1100 With thin coat plaster finish .018 .24 1.44 1400 On beams, columns, or soffits, standard, no finish included .024 .25 1.78 1450 With thin coat ... "
Key Phrases:
Description Quantity Unit Work Hours Material, Means Company, Key Items, Work Hours Material Remove, Level of Difficulty Moderate, Estimates Install, gypsum board painting, metal flush door, including general contractor, aluminum pipe rail, paddle faucets, fire alarm conductor
(see more)
|
|
Open Shop Building Construction Cost Data 2000 (Means Open Shop Building Construction Cost Data 2000)
by Phillip R. Waier
See all pages
with references to "thin coat plaster finish".
Excerpt - on Page 354: "
... 008 S.F. .27 .24 .51 .67 1100 With thin coat plaster finish 875 .018 .34 .51 .85 1.18 1400 On beams, columns, or soffits, standard, no finish included 675 .024 .31 .67 ... "
|
|
| ||
| ||
| ||
| ||